DIRECT FROM XIAMEN FACTORYFLEXIBLE MOQ 300 PCS24H 3D CAD TURNAROUNDISTA-1A DROP-TEST CERTIFIED PACKAGING
Small Batch

Test it before you commit

Small batch trial orders on existing moulds, with sample fees refunded on bulk orders. Low MOQ reduces the risk of testing a product nobody buys.

Authoritative page

A trial specification can be built and sent from the customizer. This document explains how pilot runs are costed and scheduled. Spec builder →

Small Batch Runs: Validate Demand Before Volume

The usual MOQ in this category is high enough that a market test becomes a capital decision. We run flexible lines that accept small quantities, so you can measure whether something sells before committing to a full production run.

What small batch means here

Samples. One or two stock samples can be ordered. The sample fee is refunded when you place a bulk order afterwards.

OEM on existing molds. Changing only the dial artwork on an existing design does not need new tooling, so small quantities are possible. Pricing is tiered, and a higher volume gives a better unit price.

ODM on existing tooling. Projects that change the artwork without opening a new mold also run in small and medium quantities.

ODM with new tooling. A brand-new structure needs a mold, and a mold carries a fixed cost. These projects carry a base MOQ, and the tooling fee is refundable once the bulk order reaches the agreed quantity.

Why we support pilot runs

A buyer who commits to 2,000 units of an untested design spends the money and the shelf space before knowing whether it sells. Testing at 50 or 100 costs slightly more per unit and answers the question first, so the subsequent volume decision rests on real sell-through data rather than a forecast.

What decides the minimum

Not every product can go as low as another. The minimum depends on:

  • Product size, which affects material and packing
  • Material, since steel and solid wood behave differently from plastic
  • Craft complexity, including printing, coating and assembly steps
  • Movement selection, which sets the cost floor

For that reason we quote the actual minimum per project, calculated from those four factors, rather than quoting one figure for the whole catalog.

Send the requirement and we will quote the actual minimum for it, with the tooling cost shown separately if there is one.

Request a Quote

Ready to talk numbers?

Send your requirement. We reply within 12 hours with a breakdown of tooling, unit price, packaging and freight.

Ready to order?

Send an enquiry →
WhatsAppRequest a Quote