DIRECT FROM XIAMEN FACTORYFLEXIBLE MOQ 300 PCS24H 3D CAD TURNAROUNDISTA-1A DROP-TEST CERTIFIED PACKAGING
Quality

Four stages, every unit

Incoming inspection, in-process patrol, 100% powered testing of every finished clock, and batch reliability sampling. A sealed sample is kept per batch.

Authoritative page

The four QC stations, their thresholds and their pass/fail criteria are defined on the craft & QC page. This document is the inspection record behind them. Craft & QC →

Quality Control: Four Inspection Stages

Every clock that leaves our line passes through four inspection stages, and every batch keeps a sealed sample. This page explains what is checked and why, so a buyer can audit it rather than take it on trust.

We manufacture to GB/T 6046, the Chinese national standard for pointer-type quartz clocks.

What we control

Four failure modes account for most returns in this category: movement stoppage, pointer friction and jamming, cosmetic abrasion in transit, and mounting hardware that fails under load. Below, each one is paired with the inspection stage that is designed to catch it.

1. Incoming inspection

Nothing enters production without passing first.

Movement, the core component

  • Model specification confirmed, refurbished movements rejected outright
  • Powered for at least five minutes: runs smoothly, no abnormal noise, adjustment knob turns freely
  • Time error within plus or minus 20 seconds per day on a 1.5V AA cell
  • Movement bracket firm, pointer shaft undamaged

Frame and panel

  • Material thickness checked against the order drawing
  • Coating free of peeling, sagging, scratches and rust, adhesion verified
  • Hanging fitting solidly welded or assembled, load capacity checked, no cosmetic welds

Dial and cover

  • Glass: no bubbles, chips or scratches, high light transmission, thickness and impact resistance checked on thicker glass
  • Acrylic: no deformation or surface scratching
  • Dial printing: scale, pattern and logo sharp, no ghosting, color shift or misalignment

Hands and battery spring

  • Hands straight, no contact after assembly, aligned at twelve o'clock
  • Spring retains elasticity, no rust, stable battery contact

Rejected batches are isolated and never enter production.

2. In-process control

First article. The first unit of every batch is inspected in full before mass production runs. Custom orders additionally require a sample sealed and approved by you.

Assembly patrol. Movement fixing, hand clearance, frame and hanging fittings are checked as the line runs. Defective units go back for rework and re-inspection rather than into a carton.

3. Final inspection, every unit

Each clock is checked individually. This is not a sample.

  1. Powered for at least five minutes: no stopping, no abnormal noise, no hand collision
  2. Time setting smooth in both directions
  3. Visual check: no scratch, stain or dent on frame, cover or dial
  4. Structural check: nothing loose internally when shaken, hanging assembly holds

4. Batch reliability tests

A sample from each batch additionally goes through:

  • Load testing on the hanging fitting
  • Vibration testing to simulate transport
  • Temperature cycling to catch stoppages caused by climate change
  • Dimension verification against the drawing and the approved sample

Packaging. Clocks are protected with pearl foam, and the outer carton carries model, quantity, specification and batch number.

When something is wrong

Cosmetic defects are reworked and re-inspected before shipping. Functional failures, meaning a stopped movement, a jammed hand or a hanging structure that will not hold, are scrapped and never shipped.

Defect rate is recorded per batch. If it rises, production is suspended for correction rather than continued into the next carton.

Traceability and after-sales

A sealed sample is kept for every batch, so any complaint can be compared against what we approved. Batch records cover material lot, production date and inspection log.

When a claim comes in, we separate the three causes before responding: transport damage, incorrect installation, or a defect in the product itself. The first two are not manufacturing faults. Saying so plainly is how the relationship survives a bad container.

Request a Quote

Ready to talk numbers?

Send your requirement. We reply within 12 hours with a breakdown of tooling, unit price, packaging and freight.

Ready to order?

Send an enquiry →
WhatsAppRequest a Quote
Quality Control for OEM Quartz Clocks | GB/T 6046 | Badoudao